Full catalog
Nine systems, one engineering team.
Compare protection level, weight penalty, retrofit feasibility and certification across the portfolio — then take the shortest route to a specification. BR6 glazing is 29 mm at 55 kg/m²; the portable panel goes on in an afternoon without an installer.
| System | Protection level | Weight impact | Retrofit | Certification | |
|---|---|---|---|---|---|
|
Buildings & glass
FTL Security Laminate
Bonded PET film on existing glass
|
Forced entry / anti-vandal | Under 1 mm added | Yes — no glass change | EN 356 classification in progress | Compare |
|
Buildings & glass
BTP Ballistic Glazing
BTP-1 to BTP-7 — glass, PC and PET composite
|
BR2 – BR7 | 11 – 37 mm · 27.5 – 77 kg/m² | New glazing required | EN 1063 · EN 1522 | Brief me |
|
Buildings & glass
BTP-L-4 Portable Ballistic Panel
Self-adhesive, fitted by your own people
|
BR3 – BR4 | 14 – 16 mm · 16.7 – 19 kg/m² | Yes — no installer on site | EN 1063 | Brief me |
|
Buildings & glass
WIN Window Protection Systems
WIN-1 / WIN-2 / WIN-3 — panel plus laminate
|
Shrapnel, splinter and drone containment | Panel + under 1 mm film | Yes — glass and frame | System level — project specific | Brief me |
|
Buildings & glass
BNTP Opaque Armour Panels
UHMWPE and ceramic composite, walls and doors
|
FB1 – FB7 / VPAM PM6 L6 / STANAG L2 | From 16 mm · 14.8 kg/m² | Yes — wall build-up | EN 1522 · VPAM PM6 L6 | Brief me |
|
Vehicles
Vehicle Protection
Ballistic glazing and composite armour
|
BR2 – BR7 | Weight-optimised composite | Yes — existing vehicle | EN 1063 · EN 1522 | Brief me |
|
Personal protection
Body Armor & Tactical
Plates, carriers, helmets, anti-stab
|
NIJ IIIA / III / IV | 470 g NIJ IIIA plate | n/a — issued kit | NIJ 0101.06 / 0101.07 | Brief me |
|
Aerial systems
Drone Systems
Cargo, reconnaissance, loitering
|
Dual-use platform | Platform dependent | n/a — new platform | Programme specific | Brief me |
|
Maritime — coming soon
F46 Patrol & Interceptor
Ballistic-armoured coastal platform
|
In development | — | n/a | Pending | Early access |
Not sure which line fits the project?
Answer three questions and we'll name the configuration, the standard it is tested to, and what a site survey involves.
